Class 17: 3-18-5-15-25 April 29, 2025 3-18-5-13 It was at this time that the San Francisco Bay area began planning for a regional rapid transit system. In 1956, the Rapid Transit Commission proposed a 123-mile system in a five-county area. As a result of this study, the Bay Area Rapid Transit District (BARTD) was formed within the five counties. 3-18-5-13@ It was at this time that the San Francisco Bay area began planning for a regional rapid transit system.①サンフランシスコ海岸地域が、地域の高速鉄道システムを計画し始めたのも、この時期であった。 In 1956, the Rapid Transit Commission proposed a 123-mile system in a five-county area.②1956年、高速鉄道委員会が5つの郡に123マイルシステムを提案した。 As a result of this study, the Bay Area Rapid Transit District (BARTD) was formed within the five counties.③この調査結果、5つの郡に、ベイエリア高速鉄道地域(BARTD)が形成された。 3-18-5-45 The BARTD completed the planning for the transit system and conducted preliminary engineering and financial studies. In November 1962, the voters approved a bond issue to build a three-county, 75-mile system, exclusively using local funds (Homburger, 1967). 3-18-5-45@ The BARTD completed the planning for the transit system and conducted preliminary engineering and financial studies.④ベイエリア高速鉄道地域(BARTD)は、鉄道システムの計画を完成させ、予備設計(試運転)と財政分析を行なった。 In November 1962, the voters approved a bond issue to build a three-county, 75-mile system, exclusively using local funds (Homburger, 1967).⑤1962年の11月、有権者は、3郡、75マイルシステムを構築するため、地方財源だけの公債発行を承認した。(Homburger, 1967) Time's upTime is Up!